Slide Show   Next Page

First Page in Album Previous Page in Album View Slide Show Next Page in Album Last Page in Album
Dave WV9E Tower Project
01-02-2012 9:00am Temp. 19  Wind NW 25 G 36 MPH Wind Chills 0-10 below as Terry Tom and Eric prepair for the tower work for Dave WV9E

01-02-2012 9:00am Temp. 19 Wind NW 25 G 36 MPH Wind Chills 0-10 below as Terry Tom and Eric prepair for the tower work for Dave WV9E

Vince KB9HBW, today’s climber, Tom WA9TS Eric WX9EP and Dave WV9E are assembled at the base of Dave’s soon to be new tower

Vince KB9HBW, today’s climber, Tom WA9TS Eric WX9EP and Dave WV9E are assembled at the base of Dave’s soon to be new tower

Eric WX9EP Oscar K9WKW and Terry KB9YXV are part of the ground crew installing the 55 feet of Rohn 55 tower for Dave WV9E

Eric WX9EP Oscar K9WKW and Terry KB9YXV are part of the ground crew installing the 55 feet of Rohn 55 tower for Dave WV9E

Vince KB9HBW is bolting the third section to the second section. The wind continues to blow as the 6 crazy Hams put up the tower

Vince KB9HBW is bolting the third section to the second section. The wind continues to blow as the 6 crazy Hams put up the tower

Dedicated to Amateur Radio in the Greater La Crosse, Wisconsin Area

© 2013 LaCrosseHams. All Rights Reserved

Web Hosting provided by QTH.com

Created with the QTH.com SiteBuilder.